Teaching concept · for lecturers and trainers

Supplychaingame: experience the bullwhip effect first-hand

The Supplychaingame is our further development of the MIT Beer Game, created in the early 1960s by Jay Forrester's System Dynamics group. Each group takes over one tier of a supply chain and makes exactly one decision week after week: how much do I order? Deliveries and orders take time, and at first each tier only sees its own figures. A single increase in customer demand is enough to make the whole chain oscillate.

Target group
first-semester bachelor to master's students, professional and corporate training
Duration
one session (90 min), half a day, or as a semester exercise
Group size
up to 10 chains with 1–5 tiers, 1–4 people per tier, or solo
Game length
15 periods by default, adjustable up to 50
Technology
in the browser, no installation, also on mobile; German and English
Preparation
about 15 minutes for the first game

What your participants learn

Bullwhip effect

How small changes in demand build up along the chain – and what causes this.

Systems thinking

Delays and feedback: why well-intended decisions create fluctuations.

Inventory management

Inventory position instead of stock on hand: keep goods in transit and open orders in mind.

Newsvendor model

Critical ratio, safety stock and order-up-to level – testing theory against your own figures.

Information and collaboration

What changes when everyone can see everything or is allowed to talk?

Trade-offs and costs

Holding costs versus shortage costs, your own result versus that of the whole chain.

Experience at MIT shows how large the effect is: on average, teams' costs were about ten times the optimum. In one of our sample games, the producer's orders fluctuated ten times as much as customer demand (bullwhip factor 10.1).

Source for the cost figure: John Sterman, MIT System Dynamics Group; Sterman (1989), Management Science 35(3).

More than the original

All extensions are optional. With the default settings you play the classic Beer Game.

Price and contribution margin

The customer pays per unit; revenue is shared equally. A price of 0 corresponds to the original.

Chain to measure

1–5 tiers, freely adjustable shipping and order delays.

Control demand

Classic 4 → 8, constant or random with μ and σ, each period adjustable.

Any industry

Rename product and tiers: pharmaceutical plant instead of brewery, aspirin instead of beer.

Transparency switch

See only your own tier as in the original – or the whole chain.

Competing chains

Up to 10 chains with the same demand, ranked by profit.

Solo with computer partners

Three behaviour patterns, a story for each template, a leaderboard.

One-click analysis

Bullwhip factor per tier, charts and CSV export for Excel.

One game – from first semester to master's level

Introductory

Bachelor, training courses

  • classic settings
  • demand 4 → 8
  • focus: experience and explain the bullwhip
  • 15 periods

Advanced

Bachelor from 3rd semester

  • random demand with μ and σ
  • price > 0, contribution margin
  • second round with transparency
  • 15–25 periods

Expert

Master, executive education

  • newsvendor and order-up-to level
  • compare computer partners
  • CSV analysis, variance ratio
  • up to 50 periods

Course formats

One session

90 minutes · 1 round

Introduction to SCM, logistics lecture, corporate training.

Half a day

3–4 hours · 2 rounds

Experiment: classic versus transparency or shorter shipping delay.

Semester exercise

1 session each · solo templates

Newsvendor and order-up-to level as an assignment, with a leaderboard as an incentive.

Online and hybrid

any length · with chat

Live status lights and chat per chain; the moderator can write to everyone.

Example: one 90-minute session

TimeContentGoal
0:00Introduction with the participant slides, assign tiers, hand out login detailsUnderstand the idea and rules
0:15Read period 0, place the first order – without time pressureGet to know the cockpit
0:25Periods 1–15, about 2 minutes per period, automatic calculationDecide under delays
1:00Teams estimate: what did customer demand look like?Perception and reality
1:05Show the analysis: orders per tier, bullwhip factor, costsMake the bullwhip visible
1:15Debriefing: causes and remediesSecure the insights

The moderator package also contains a half-day schedule with an experiment, debriefing questions with answers and suggestions for assessments.

A look at the lecturer slides

Selected slides from the 23-slide lecturer deck. The screenshots show the game's German interface; the game itself can be played in German and English.

Materials

Free

Introduction for participants

14 slides to get started: mission, supply chain, what happens in a week, costs and goal, cockpit, rules and five tips. Show them at the start or hand them out for preparation. Fields in square brackets (event, rules, grading) are completed by the moderator.

View PDF PDF, 0.9 MB
Try it yourself

Solo game

Play it yourself first: control all four tiers, run one tier with computer partners, or try the newsvendor model. Signing in with a name and password is all it takes.

Go to Supplychaingame
On request

Moderator package

  • Moderator access: set up games, run them live, analyse results
  • "Teaching concept" slide deck (23 slides) with speaker notes
  • Schedules, debriefing questions with answers, assessment formats
  • Participant introduction as an editable PowerPoint file
Request package by email to info@wibfin.de

← All simulations and games

Consulting & Science Research & Sustainability Training & Gamification